When using "Build Survey," it allows you to set the survey date. However, if you entered a read someplace else in the same session, when you actually enter in the read for the blank reads created in "build survey" it will change the inspection date to the last entered date instead of using the one I told it in "build survey.".
For Example, I open a SystemID and enter a read for today, and lets say "today" is 1/31. Then I open another systemID and use "Build Survey" and set the inspection date to 1/29. When I enter data in those blank reads, the date will automatically c...